Canal Istanbul first bridge details

Canal Istanbul first bridge details

Canal Istanbul first bridge details

kanal istanbul güzergahı

The first bridge to be built within the scope of the Canal Istanbul project will be connected to the Sazlıdere crossing within the scope of the North Marmara motorway Project Basaksehir – Bahçeşehir Segment. The total length of the first bridge will be 1,618 meters. There will be a 2×4 lane traffic crossing over the bridge. The towers of the bridge, which will be 46 meters wide, will be built with Diamond geometry and will be 196 meters.

The main span of the first bridge to be built will be 440 meters. The length will be 860 meters with side openings of 210 meters on the right and left. When viaducts are added, the total length will reach 1,618 meters. The amount of oblique hanger rope was calculated as 136 and the anchor amount was calculated as 272 pieces. The bridge’s towers will have variable box sections in terms of plan sizes and wall thicknesses. The towers will stand on two reinforced concrete feet. These feet will be connected to each other at the level of the table and through the krss in the hill section.

6 BRIDGES TO BE BUILT

A total of 6 bridges will be completed along the route as part of the Canal Istanbul project. The overall cost of the project will be $15 Billion by today’s calculation. The cost of the six bridges to be built was calculated as $1.4 million. However, these costs may be reduced during the tender phase.

TO BE COMPLETED IN 5 YEARS

According to ministry of transport and infrastructure officials, 500,000 jobs will be created during the construction phase of the Canal Istanbul project. When Canal Istanbul is completed, two separate cities will be established on both sides of the canal. A study is also being prepared for the cost of Kanal Istanbul with the housing projects to be carried out in these areas. The construction works, which will last for 5 years, are expected to be completed by 2027 at the latest.

You can visit www.turkishpropertıes.com.tr page to find the details of the first bridge to be built in Kanal Istanbul and the news.

For more information about Kanal Istanbul; https://tr.wikipedia.org/wiki/Kanal_%C4%B0stanbul

Related posts

Where to receive a valuation report for real estate sales for acquiring Turkish Citizenship?

A valuation report is to be received from the valuation firms listed on the Capital Market Board's...

Continue reading

If multiple bank receipts are paid in Turkish Lira with different dates are submitted, How is the value of the property calculated?

Total values calculated based on the Central Bank of the Republic of Turkey's effective sale rate...

Continue reading

Which Date Is Taken Into Consideration To Determine The Exchange Rate For The Bank Receipts Presented To Evidence Payment?

If the bank receipt is paid in Turkish Lira, the USD equivalent of the value in the bank receipt is...

Continue reading